XANSYS Message: 81 [Go back to message list] [bookmark on del.icio.us]
No rating yet Subject: Substructuring Author: Marc Seidel Date: 1998-12-18 04:35:00Thanks to everybody who helped me to get started with substructuring so far! But I have a new problem: My model is very large, I have to import my substructure 32 times. Even though the number of master nodes is small (for one substructure about 100 nodes) the node numbers are in a wider range because of gaps between the master node numbers. So if I import my substructures I have to increase the node numbers by a large offset value (using SETRAN) so that the node numbers exceed 64000 in my main model.
Is there a way to renumber the nodes so that the master nodes are the first nodes from node number 1 to 100, numbered consecutively? I could use a smaller offset value then so that highest node does not exceed 64000.